| e | Void ratioVolume of voids ÷ volume of solids. Governs compressibility and permeability. | — | dense sand ~0.5 · soft clay 1.0–1.5 · peat >3 | — |
| C_c | Compression indexSlope of the e–log σ′ virgin line — how much a normally-consolidated soil compresses under load. (Not to be confused with the gradation coefficient of curvature C_c — see "curvature".)≈ 0.009·(LL − 10) (Skempton) | — | soft clay 0.2–0.5 · stiff clay 0.05–0.15 | — |
| C_r | Recompression indexSlope of the unload–reload line; governs settlement below the preconsolidation pressure. | — | ≈ 0.1–0.2 × C_c | — |
| C_v | Coefficient of consolidationHow fast pore pressure dissipates — sets the time for settlement to occur. | m²/yr | silt 1–10 · clay 0.1–3 m²/yr | IS 2720-15 |
| m_v | Coefficient of volume compressibilityVolumetric strain per unit effective-stress increase. Inverse stiffness for 1-D loading. | m²/MN | stiff clay 0.05–0.1 · soft clay 0.3–1.5 | — |
| OCR | Over-consolidation ratioPast maximum effective stress ÷ current effective stress. OCR=1 is normally consolidated; >1 is over-consolidated (stiffer, less settlement).OCR = σ'p / σ'v0 | — | 1 NC · 1–3 lightly OC · >4 heavily OC | — |
| σ′_v | Effective vertical stressOverburden pressure minus pore-water pressure at a depth. | kPa | — | — |
| σ′_p | Preconsolidation pressureMaximum past effective stress (Casagrande); the soil is stiffer below it (recompression). | kPa | — | IS 2720-15 |
| S | SettlementVertical downward movement of the foundation under load — immediate + consolidation + secondary. | mm | — | — |
| δ | Differential settlementDifference in settlement between two foundation points. Drives angular distortion and structural cracking, often more critical than total settlement. | mm | allowable ≈ 1/500 angular distortion (framed) — Skempton-MacDonald | — |
| T_v | Time factorDimensionless time in Terzaghi 1-D consolidation; maps degree of consolidation U to elapsed time. | — | U=50% → Tv 0.197 · U=90% → Tv 0.848 | — |
| U | Degree of consolidationFraction of the ultimate consolidation settlement completed at a given time. | % | — | — |