The ground, from borehole to signed report. One system.
Log it on a phone, test it in the lab, check 233 analyses against their code clause, solve it in finite elements in 2-D and 3-D, and sign a report your client can verify.
From $179 a month for the whole firm. 14 days free, no card.
In your browser, on iPhone and on Android.
You are licensing a stack of programs to write one report.
A logging package, a slope program and 2-D finite elements, each sold by the seat and by the year — and 3-D finite elements on top if you take them. Here they are one record and one price for the firm, 3-D included.
Watch one job go from the rig to the signature.
Logged at the rig, on a phone, with no signal.
The log draws itself to scale as the driller calls the depths. It syncs when the phone finds a network, and the lab, the analysis and the report all read these same layers.
6 layers · 13 SPT readings · to 24 m · synced
Imports and exports AGS 4 and DIGGS. Field and lab seats are free.
A 20 m wide excavation, built the way it is built.
Solved by the TerraBrains finite-element solver: the anchored excavation of the PLAXIS 2D Tutorial Manual, Tutorial 7. The brass line is the left wall, its movement drawn 60 times larger. Both anchors read exactly 500 and 1,000 kN at their prestress stages, as published.
Three independent answers agree.
A factor of safety from one method is a number. From three, it is an answer.
The finite-element studio sets each safety phase beside limit equilibrium and beside bounds that the true answer must lie between, where the materials allow it. If they disagree, you are told before your reviewer tells you.
Every analysis prints its method and governing clause. Bearing capacity, earth pressure, piles and slopes re-check the same inputs to the design code you pick.
Calculate the ultimate bearing capacity of a 2 m wide strip footing founded 1 m deep. Cohesion 20 kPa, friction angle 30°, unit weight 18 kN/m³.
Inputs it used: B 2 m · Df 1 m · c 20 kPa · φ 30° · γ 18 kN/m³ · strip
Ask in plain English. It runs the engine, not a guess.
AI Core picks the analysis, fills it from what you typed or from the project, and shows every input it used so you can correct one and run it again.
It answers from your records and the cited standards. It drafts and calculates. It never signs.
Geotechnical design report
Your client scans the code and sees who signed it.
The report is written from the record, so every figure in it traces to a borehole, a test or a calculation. Checker and approver sign before the engineer does.
AI Core drafts and calculates. It never signs.
The same job, the way you do it now and the way it goes here.
| Step | The usual stack | TerraBrains |
|---|---|---|
| Log the borehole | A logging package on the office desktop, after the fieldwork. | On the rig, on a phone, with no signal. It syncs when the network returns. |
| Record the lab | Spreadsheets, copied in from the lab's files. | 47 tests entered against the same boreholes and samples, with calibration and custody. |
| Run the analysis | Separate programs, each with its own licence. Inputs typed in again. | 233 analyses and a finite-element studio read the logged record and print the method and clause. |
| Issue the report | Figures and tables pasted into Word, exported to PDF. | Drafted from the record, checked, approved, signed, and checkable by anyone with the QR code or the PDF. |
| Pay for it | A licence per seat, per module, per year. | One subscription for the firm. Field and lab seats free. |
One system, the whole discipline.
233 analyses, each with its method and clause, 47 lab tests, and a finite-element studio with 15 soil and rock models. Here is what that covers.
From a first check to an earthquake in effective stress, in 2-D on our own solver. Mohr–Coulomb and linear elastic also run in 3-D.
- Mohr–Coulomb
- Linear elastic
- Hardening Soil
- HS small
- Soft Soil
- Soft Soil Creep
- Modified Cam-Clay
- Hoek–Brown
- NGI-ADP
- Jointed Rock
- SANISAND
- S-CLAY1S
- Barcelona Basic
- PM4Sand
- PM4Silt
The triggering methods are scored against sites where the ground did, or did not, liquefy.
- Idriss & Boulanger 2010 (SPT)230
- Cetin et al. 2016 (SPT)210
- Boulanger & Idriss 2014 (CPT)253
- Moss et al. 2005 (CPT)174
Don't take our word for a single number.
We ran 333 benchmark problems through our solvers and printed every result, including the ones we miss. Here are six. Every row names its source and page, so you can rebuild it and compare.
| Published problem | Ours | Published | Difference |
|---|---|---|---|
| Total force on a rigid footing | 601 kN | 588 kN | +2.17 % |
| Settlement of a flexible footing | 48.7 mm | 49.6 mm | −1.72 % |
| Slope with a crest load, factor of safety | 1.259 | 1.261 | −0.13 % |
| Force in a prestressed anchor | 500 kN | 500 kN | 0.00 % |
| Factor of safety, serviceability stage | 1.48 | 1.49 | −0.48 % |
| Vibration amplitude at the surface | 0.0336 mm | 0.0339 mm | −0.80 % |
Published values from the PLAXIS 2D Tutorial Manual. The name identifies the source only.
What changes for each person in the firm.
One bill, and a report you can stand behind.
- One subscription replaces a row of licences
- Checker and approver recorded before every signature
- Every figure in a report traces to its source
The answer, its clause, and a second opinion.
- Pick the design code and the same inputs are checked again
- Finite elements set beside limit equilibrium and bounds
- Nothing retyped between the log, the lab and the model
A phone at the rig. A bench sheet that fills itself.
- Works with no signal and syncs later
- Samples tracked from the hole to the certificate
- Their seats cost nothing
Start from where you are.
gINT support is ending. Your logs don't have to.
Export AGS 4 and drop it in. Boreholes, layers, samples and SPT values arrive as a working project.
Bring a file across Using PLAXIS, Rocscience or GeoStudioThe same problems, in a browser, beside the boreholes.
Staged excavations, embankments, slopes, tunnels and earthquake response in 2-D, and footings, slopes and consolidation in 3-D. Included on every plan.
See what it models Using spreadsheets and WordType a reading once.
Lab certificates, analyses with their clause, and a report that fills itself from the record.
Try a free calculatorNot ready to switch? Use these, free.
No account. The same engines as the product, in your browser.
One price for the firm. Modelling included.
Pick the size of your team. Drillers, loggers and lab technicians never count: their seats are free.
- 195 of 233 analyses and 47 lab tests; 38 more in the optional Suites
- Finite elements in 2-D and 3-D
- Signed, verifiable reports
- iPhone, iPad and Android apps
- AGS, DIGGS and CSV out, any time
- Monthly, cancel when you like
Solo includes 2 engineers and 1 modeller.
Why you can hold us to this.
Geotechnical reports get signed by a person, and that person carries the result. So the software has no business asking for trust. It should show its method, its clause and a second answer, and let you check.
That is why every benchmark we have run is public, including the ones we miss, and why your data leaves whenever you want it to, in open formats.
If a number here ever disagrees with one you trust, send it to me. We will find out which is right and publish the result.
VinayFounder, TerraBrains · hello@terrabrains.ai
Before you ask.
Who is responsible for the numbers?
You are, as you are today. TerraBrains shows the method, the clause and a second answer so that checking is quick. Nothing is signed until a named engineer signs it.
Can I get my data out?
Yes, at any time, as AGS 4, DIGGS, CSV and PDF. If you leave, your signed reports still verify.
Is finite-element modelling in a browser serious?
It is our own solver: staged construction, 15 soil and rock models in 2-D, from Mohr-Coulomb to Hardening Soil and PM4Sand, with consolidation, seepage and dynamics. Footings, slopes and consolidation also solve in 3-D. The published problems it reproduces are listed with our number beside theirs.
Does it work on site without a signal?
Yes. The phone and tablet apps save every entry on the device and sync when a network returns.
What happens when the 14 days end?
You choose a plan or you stop. No card is taken to start, so nothing is charged by surprise. Add a card during the trial and it runs to 30 days.
Run a job you have already signed.
Rebuild one finished project and compare the number with the one in your report. An afternoon, no card.