Leaving gINT? Bring your boreholes.
Support for gINT ends on 31 December 2028. An AGS 4 export moves your logs across in minutes, and the analysis, modelling and signed reports are then in the same place.
The date is the vendor’s own. Read the announcement.
Three steps.
No conversion service and no waiting. It takes minutes, and you see every record before it is saved.
Export from gINT as AGS 4
One open file carries the factual data of the project: locations, strata, SPT and samples.
Drop the file in
It is read in your browser. The AGS groups are mapped to boreholes, strata, SPT and samples, and anything that needs your eye is marked.
Review and save
Check the proposed records, choose the project, save. The logs are ready for analysis, modelling and reports.
What moves across.
The factual record comes across as data, not as pictures of logs. Check the file first with the free AGS file checker if you like.
- Boreholes and locations
- Strata with descriptions
- SPT N-values
- Samples: reference, type and depth
- Lab results from summary sheets
- Rig and final depth per borehole
What you have afterwards.
Logging was the whole job in gINT. Here it is the first step of one record.
Per month, from
$179
Engineers included
2
Free trial
14 days
Bring one project across this week.
Export AGS 4 from gINT, drop it in, and keep working on the same boreholes with analysis, modelling and signed reports.