Skip to main content
Terzaghi 1-D · e–log σ′ · IS 8009 (Part 1):1976

Consolidation settlement and time calculator

Primary consolidation settlement of a layered clay profile by the e–log σ′ method (Cc, Cr, σ′p per layer) and how it develops with time by Terzaghi 1-D theory — the multi-layer analysis TerraBrains runs in a project, after IS 8009 (Part 1):1976.

Free · no signup · computed in your browser by the engine TerraBrains runs in the app.

Inputs

Illustrative inputs are loaded to demonstrate the method. Replace them with your measured project data before interpreting results.

Keep this calculation

Free here. In TerraBrains this result is saved to the project, carries its clause into a signed report your client can verify, and updates when the borehole does.

Log the borehole this came from — the TerraBrains field app on iPhone, iPad and Android works offline on site and syncs the SPT, samples and layers to the same project.

Worked examples — checked live

Each example comes from a published source. Its inputs run through the same engine as your calculation above; a ✓ means our value is inside the tolerance stated for that example. Load one to see it in the form.

6 m clay under an extensive 3 m fill — final and 3-year settlement

Source: Craig's Soil Mechanics, 8th ed. (Knappett & Craig), Example 4.6(a) — 182 mm final; 61 mm after 3 years

2/2 within tolerance

σ′0 at clay mid-depth = 2×17 + 6×(19 − 9.8) + 3×(20 − 9.8) = 119.8 kPa (Craig uses γw = 9.8); Δσ = 3 m × 20 kN/m³. The base is impermeable (single drainage, Hdr = 6 m). The fill is placed over one year, so the 3-year time is corrected to 2.5 years.

QuantityPublishedOursΔWithin tolerance
Final consolidation settlement (mm)182.0182.50.28 %✓
Settlement 3 years after filling began (t = 2.5 yr corrected) (mm)61.0060.920.13 %✓

Tolerance: ±1 % (Printed to 3 s.f.) · ±1.5 % (Printed to 2 s.f.)

Questions engineers ask

How is each layer’s settlement computed?

By the e–log σ′ method with the stress path branched on σ′p: Sc = H/(1 + e₀)·[Cr·log(σ′p/σ′₀) + Cc·log(σ′f/σ′p)] when the final stress σ′f = σ′₀ + Δσ crosses σ′p, Cr only if it stays below σ′p, Cc only for a normally consolidated layer. σ′₀ and Δσ are taken at the layer’s mid-depth. A blank Cr defaults to 0.1·Cc and a blank σ′p to σ′₀.

How is the time-rate worked out for several layers?

Each layer uses its own cv and drainage path — H/2 when both faces drain, H when only one does — and its own Terzaghi U–Tv curve with Tv = cv·t/H_dr². The profile’s degree is settlement-weighted: U(t) = Σ Sᵢ·Uᵢ / Σ Sᵢ, and the settlement realised at t is Σ Sᵢ·Uᵢ.

Should I split one clay stratum into sub-layers?

For the settlement, yes — thinner sub-layers follow the stress change with depth more closely. For the time, enter one layer per drainage unit: splitting a stratum makes each piece drain on its own faces, which shortens the computed time.

What units does cv take?

m²/year, so the times come out in years. A laboratory cv in cm²/s converts as 1 cm²/s ≈ 3156 m²/year.

All ten calculators

Save it, sign it, keep it current.

A free account saves the result to a project with its PDF calculation sheet, and carries the clause into a signed report your client can verify. The same engines run 233 analyses and 47 lab tests inside. 14 days free, no card.